Check out our latest paper published on Science of the Total Environment (STOTEN)!
In this study, a full-scale S2EBPR pilot was operated with a sidestream plus carbon config-
uration (SSRC) at a carbon-limited facility. A model based on the pilot test was developed and calibrated in the SUMO platform and used to explore routes for improving orthophosphate (OP) effluent compliance. Overall, this pilot and modeling study shows that joint strategies, including RAS diversion, carbon addition and PE control, can be effective to achieve optimal control of OP effluent.
See paper here: https://www.sciencedirect.com/science/article/pii/S0048969722063793?via%3Dihub
